Price Increase
Please be advised that EVAPCO North America prices are hereby increased as shown below effective Friday, June 5th. All quotations offered on or after June 5th must be based on new pricing and
all orders entered on or after J uly7th, 2026, must be entered with new/revised increased prices.
Current pricing and new pricing will be available in Spectrum June 5th through July 6th, but on July 7th, only new pricing will be available.
All Cooling Towers, Options and Accessories......................................................... Average of Three Percent (3%)
All Evaporative Closed Circuit Coolers, Options and Accessories.............................. Average of Three Percent (3%)
All eco-Air Adiabatic Coolers & Condensers, Dry Coolers, Air Cooled Condensers, Options and Accessories…
.......................................................................................................................................................…Average of Six Percent (6%)
All Evaporative Condensers, Options and Accessories............................................................ Average of Three Percent (3%)
All Evapcold Models, Options and Accessories........................................................................ Average of Eight Percent (8%)
Pulse~Pure Water Systems, Options and Accessories............................................................ Average of Three Percent (3%)
SmartShield Water Systems, Options and Accessories........................................................ Average of Eight Percent (8%)
Replacement Parts for Cooling Towers, Closed Circuit Coolers, Condensers, Evaporators and Water Systems................................................................................................................................... Average of Three Percent (3%)
All Stainless Steel/Aluminum Evaporator (including SSTP Penthouse Models) Base Units, Options and Accessories.
............................................................................................................................................... Average of Six Percent (6%)
All CPA Systems, EDF Make-Up Air Units, Options and Accessories........................ Average of Three Percent (3%)
All RVS Vessels, Options and Accessories...................................................................... Average of Three Percent (3%)
All RVS Packaged Products.............................................................................................. Average of Three Percent (3%)
All EVAPCO LMP Products, Options and Accessories................................................. Average of Three Percent (3%)
All EVAPCO SelectTech Products, Options and Accessories...................................... Average of Three Percent (3%)
Ice Coils and Ice Tanks.................................................................................................. Average of Three Percent (3%)
Freight to all locations remains as Pre-Paid and Add. Freight estimates in SPECTRUM have been increased up to Fifteen Percent (15%) based on current freight charges. Please note that these are estimates only and actual freight charges will be invoiced.
Terms and Conditions:
New Quotes: Must be offered at New Pricing on and after................................................................... June 5th, 2026
Price Protection: Convert Outstanding Quotes to Orders on or before............................................... July 6th, 2026
- Firm purchase order required to price protect the order
- ALL ORDERS ENTERED ON OR AFTER JULY 7TH, 2026, MUST BE ENTERED AT NEW PRICING.
Shipment Required: Price Protected Order Must Ship before........................................................... January 8th, 2027
SPECTRUM: Both old pricing and new pricing will be available June 5th through July 6th, 2026.